I was initially apprehensive dealing with this extensive home repair. Bay Area Underpinning came into the equation and I am so glad we went with them! Professional, prompt, efficient and just a wonderful overall experience from the engineer, project manager/lead and concrete guys (Rick and Jim just as an FYI). Thank you again for all your wonderful help!

  • Overall Experience
  • Quality
  • Price
  • Convenience

Job Locations
for san leandro, ca

James B.

James B. Job Checkin

Waiting on Building inspector to finalize recently completed 15 resistance pier project with adjustable floor supports,to stabilize the foundation and level the floor.

Waiting on Building inspector to finalize recently completed 15 resistance pier project with adjustable floor supports,to stabilize the foundation and level the floor.

Richard S.

Richard S. Job Checkin

Pressure washed back filled and ready for concrete crew!

Pressure washed back filled and ready for concrete crew!

Richard S.

Richard S. Job Checkin


Richard S.

Richard S. Job Checkin

Jp44s successful installed

Jp44s successful installed

Richard S.

Richard S. Job Checkin

Another successful lift

Another successful lift

Richard S.

Richard S. Job Checkin

Another successful lift

Another successful lift

Richard S.

Richard S. Job Checkin

Ecp model 300 push piers ready for lift. Measured , cut , filled with concrete, ready to lift later this week.

Ecp model 300 push piers ready for lift. Measured , cut , filled with concrete,  ready to lift later this week.

Richard S.

Richard S. Job Checkin

Interior push piers ready to be measured, cut , capped, and filled with concrete.

Interior push piers ready to be measured,  cut , capped, and filled with concrete.

Richard S.

Richard S. Job Checkin

Removing and off hauling a concrete footing for an entry way staircase. Later on in the project concrete team will be on site to replace the staircase

Removing and off hauling a concrete footing for an entry way staircase. Later on in the project concrete team will be on site to replace the staircase

Richard S.

Richard S. Job Checkin

Today we will be excavating, mounting and pushing on a home in San Leandro, CA.

Today we will be excavating, mounting and pushing on a home in San Leandro, CA.

Richard S.

Richard S. Job Checkin

Driving our first pier on our model 300 ecp push pier

Driving our first pier on our model 300 ecp push pier

Richard S.

Richard S. Job Checkin

Properly mounted model 300 ecp push pier

Properly mounted model 300 ecp push pier

Richard S.

Richard S. Job Checkin


Richard S.

Richard S. Job Checkin

Beautiful day in the bay area. We're starting a 15 pier job. The crew starts with excavating and mounting our model 300 ecp push piers


James B.

James B. Job Checkin

Waiting on Building inspector to finalize recently completed 12 resistance pier project to stabilize the foundation and level the floor.

Waiting on Building inspector to finalize recently completed 12 resistance pier project to stabilize the foundation and level the floor.